The Flumper Army has certainly been kept busy on the Lake Zone this week!
The two massive 75-tonne excavators have been digging deep into the black stuff, loading up the flumpers with dark clay ready for the journey over to the Core Zone.
It's amazing just how much material is being shifted around the Universal UK Resort site at the moment.
The flock of dumpers seem to be on a never-ending loop, with the two big excavators keeping them well fed!
Join the discussion +
Comments